Home | Work | Healthcare | Specialist / Tertiary Healthcare | Halton Hospital, Cheshire

Halton Hospital, Cheshire

The Cheshire and Merseyside ISTC is a three storey, standalone building providing orthopaedic care facilities within the grounds of the Halton General Hospital in Runcorn, Cheshire. The building was constructed as part of the Department of Health’s plan to increase the current NHS treatment capacity.

The ground floor contains out-patient consulting rooms and a physiotherapy treatment area together with an imaging centre, which includes MRI, CT and X-ray. In-patient accommodation totalling 44 beds and support facilities such as catering are provided on the first floor. The operating suite with four theatres, recovery areas, clinical administration and staff support accommodation are located on the second floor.

The building used fast-track construction methods and off site pre-fabrication to meet the tight programme requirements. The whole process, from inception to completion, was carried out within 18 months.

The external appearance provides the users with a health facility that is welcoming, reassuring and accessible and is a twenty-first century healthcare facility embracing best practice, innovative design and the latest technology and I.T.

The new building upgrades the image of the existing hospital providing a facility that has a tangible impact on the level of healthcare provided by the Halton NHS Hospital Trust.

Client: Bovis Lend Lease Pharma for Interhealth Canada Ltd
Value: £17 million
Dates: 2004 - 2006
Area: 6500 sqm
Status: Completed

Rosie Perinatal Hospital, Cambridge

Completion Date: 2012

Value: £14 million

Maidstone Hospital, Cellular Pathology

Completion Date: 2011

Value: £6.5 million

Children's Centre, Salisbury District Hospital

Completion Date: 2011

Value: £3.3 million

Royal National Orthopaedic Hospital

Completion Date: 2011

Value: £100 million

William Harvey Hospital, Maxillofacial Unit

Completion Date: 2011

Value: £3.5 million

Royal Brompton Hospital, New Cardiovascular Biochemical Research Unit

Completion Date: 2010

Value: £2.5 million

Peninsula Dental School, Truro

Completion Date: 2010

Value: £7.5 million

Al Ain Cromwell Maternity Hospital, Abu Dhabi

Completion Date: 2009

Value: £50 million

Royal London Hospital for Integrated Medicine

Completion Date: 2008

Value: £18 million

Peninsula Dental School, Devonport

Completion Date: 2008

Value: £4.6 million

Clinical Neuroscience Centre, Queen Square

Completion Date: 2008

Value: £6 million

Kensington Wing, Chelsea & Westminster Hospital

Completion Date: 2008

Value: £3.25 million